After 450 hours spent on the left wing, and 225 hours spent on the right wing, the wings were put to the side to make room for the fuseloge assembly before being taken to a hanger spot for covering and after to a paint booth for painting.
Here is a timelaps video of the left wing build. Hope you enjoy seeing 450 hours compressed down to 5 minutes.